Stormwater Control Measures

As part of the compliance requirements of the Phase II Stormwater Program mandated by federal and state governments, Stormwater Control Measures (SCMs), previously known as Best Management Practices (BMPs), were required to be installed to capture and treat storm water runoff from your property when your project was developed.  These SCMs were designed to allow pollutants in the runoff to be filtered prior to release from your property.

State guidelines were used when these SCMs were designed and installed.  As part of these guidelines, regular inspection of components of each water quality treatment measure, or SCM, and detention structure, is required. Any deficient elements in the SCM should be corrected, repaired, or replaced immediately.  These deficiencies can affect the integrity of the structures, safety of the public, and the pollutant removal efficiency of the SCM.

Design requirements


As-Built Certification

  • Follow the checklist on the SCM Intake Form to execute the SCM maintenance agreement.
  • Please submit the following to Clint Shoaf for review:
    • As-Built Plans
    • As-Built Survey
    • As-Built Checklist (below)
    • Calculations
  • Please complete the As-Built Site Visit Inspection (through the map below).

As-Built Checklists

As-Built Site Visit Inspection

Please find your site on the map and complete the inspection report.  This report is used to assure the device is in good condition at the end of the construction phase. The engineer sealing this form must visit the site as part of this as-built inspection process.

legend

 

Annual SCM Inspections

Mailing Address
City of Concord
Water Resources
P.O. Box 308
Concord, NC 28026

Physical Address
Alfred M. Brown Operations Center
635 Alfred Brown Jr Court SW
Concord, NC 28025

For Stormwater issues or questions, please call 704-920-5555.