Forms & Downloads

Electric Plan Review Process
A process in which contractor/developer/resident must follow to receive approval for the plan or plat.

Electrical Load Data Sheet
The Electric Systems department, in accordance with the City of Concord's Plan Review Process for submittals, must require an Electrical Load Data Sheet. This Information is critical for electric staff to be able to calculate and plan for the equipment.

Metering Specs
The metering specifications are designed to assist contractors during installation of electric meter enclosures.

Plan Review & Permitting

Service Agreement
To provide underground service, we must rely on your knowledge of your property in order to install the lines safely. You are the primary source of information on underground structures that might be damaged by our equipment or might cause injury to our

Subdivision Checklist
Prerequisites of design/installation of design facilities.

NC GreenPower Application

PEAKING PARTNERS - Sign-up Sheet
The information provided on this application will be used, by the City of Concord Electric Systems, to send the CONTACT person (listed on the application) an email, text or voice message when we have evidence that a PEAK POWER situation is going to occur.

CONTACT INFORMATION

Mailing Address
City of Concord
Electric Systems
P.O. Box 308
Concord, NC  28026-0308

Alex Burris
Director of Concord Electric Systems
(704) 920-5335

Scott Chunn
Deputy Director of Electric Systems
(704) 920-5304

Fred Porter 
Electrical Engineering Manager
(704) 920-5303

Christopher Greene
Supervisor, Electric Metering Systems
(704) 920-5316

Jackie Rushing
Electric Overhead Operations Coordinator
(704) 920-5306

Billy Robins
Electric Underground Operations Coordinator
(704) 920-6328

John Russell
Project Engineer
(704) 920-5309

Andrea Cline  
Coordinator, Substation Maint., SCADA and Peak Generation
(704) 920-5325

Jenny Volpicelli   
Electric Safety Coordinator
(704) 920-5328