SCM Inspections

Annual SCM Inpsections

Please view the video below for the new SCM Annual Inspection process.  All inspections are required to be completed using this new electronic process.

*All inspections must be completed between March 15 and May 15, 2021.*

 

View larger map

 

Electronic Annual SCM Inspection FAQs

  • All annual inspections must be completed through the new electronic process on the City website.  www.concordnc.gov/SCM-Inspections
  • Inspections using the old form will not be accepted.
  • You must click the correct dot on the map for each inspection.
  • If you don't see the SCM you're trying to inspect, please email scheipc@concordnc.gov and we will add the point.
  • A North Carolina licensed Professional Engineer must complete the Annual Inspections.
  • A minimum of 4 photos are required.

If you have specific questions, please contact Crystal Scheip at scheipc@concordnc.gov or 704-920-5287.

Periodic/Monthly SCM Inspections

Periodic inspections should be completed using the forms below, and kept on site until requested by the City.  Please do not send monthly reports to the City, every month.  An audit will be completed annually, where a month from the previous year will be requested.

 

Mailing Address
City of Concord
Water Resources
P.O. Box 308
Concord, NC 28026

Physical Address
Alfred M. Brown Operations Center
635 Alfred Brown Jr Court SW
Concord, NC 28025

To contact Water Resources, please call 704-920-5342.